Sunday, June 22, 2008

SEATTLE JAPANESE GARDEN KAMI CALMING CEREMONY

On June 16 2008 a ground breaking ceremony, of sorts, was held at the site of the future Garden Gatehouse Village.

Reverend Barrish of Tsubaki Shrine in Granite Falls, Washington came to perform the Jinchinsai, a Shinto rite which is done prior to breaking ground for buildings. Respects are paid to the kami of the land about to be disturbed.

Bamboo poles held rope and folded paper at the building site. A mound of sand is placed to the side of the portable alter. The ceremony follows a series of moves:


bowing

clapping

waving

reading


pouring sake


burying an amulet, which later will be buried under the building.
Also a folded white paper amulet will be placed in the attic, together they, along with this ceremony will ward off disasters and misfortune during and after the construction.





Next, a cake with rendering of the Village on it was served with tea,


followed by a stroll through the garden to see the iris in bloom:

Friday, June 20, 2008

ZCY GOES TO WORK

The walls may be rough, and the steel may be exposed,  but Zhichunyuan has been put to work!

From the College's arboretum gazebo, Judy Koenig orients a tour group to the Garden.


On to inside ZCY, where one can gain an understanding of the completed courtyard's size if not feel. 


However, that "feel" can still be sensed over at Songmeiting. Although the plantings around it are now minimal, the design and materials of the gazebo give a glimpse of what the completed gates and walkways of Zhichunyuan will be.

Sunday, June 8, 2008

CLOUD HOUSE CREEPS

Construction of Cloud House in Oregon DID take a giant step forward with the issuance of the Building Permit.

Now if I could JUST figure out what all the pieces of paper and red line notations all mean... I DO know that "2190" is the street number and they require that the big orange card be posted so the inspectors can find the place.

A second step was lining up an excavator to clear the site and cut in the access road. He hopes to start that by the end of June. Will see....

SEATTLE CHINESE GARDEN RECEPTION ROOM

While construction of Zhichunyuan pauses, promotion of the Garden continues.

The Reception room was open during South Seattle CC's annual Tea and Tour. The room has numerous Chinese items as well as information about the Garden design and construction.


A pair of doors anticipate the opening of the Garden.



And hard hats wait for visitors on HHT's: Hard Hat Tours, an opportunity to visit Knowing Spring Courtyard while under construction.

404 MBATH WORKS

It's not totally finished, but at least it is functioning!

Zhufeng is practicing towel flamenco as I look down the hallway from the bedroom to the bath. The biggest missing piece is a sliding door which will go between the two floor rugs.

Looking at the left side of the vanity, with three medicine cabinets above, and four storage cabinets above them! 

The right side, with jon and towel warming rack to right.

And peering in the shower...