Monday, October 12, 2009


CLOUD HOUSE GETS SIDING, WINDOWS (ALMOST) AND ROOFS!


After arrival of the cedar siding, excitement took over, and the west wall (to the left) was laid up.
Backwards, but, hey, looks great, no?
Then Saddle-Bag North was done: Abe and Ian screw from the back of a siding board a "fin".


It takes the whole crew to install a 22' long board with fin.


Finished!


For those who cannot wait to see what will go on the Core Walls
beyond the Saddle Bag, here is a sample.


Need to get the rain leaders in the niches, in order to do the roofs.


Meanwhile, Clayton of Pacific Glass ,
brought out a sample of the
store front window setting sill and frame.


His crew came and set their sill and then we added
a PVC sill-pan and ...


... a stainless steel sill, and edge metal.

At the top things got neatly wrapped with ice and water shield.
.
Now the Low-Roofs. First scuppers of stainless laminated with vinyl.

Then black under-layment tacked to the plywood sheathing.


90 mil vinyl unrolled, and cut to fit.


Where the roof jigged and jagged, the vinyl was cut to do likewise.
Heat gun in one hand, roller in other, the pieces were welded together.
A shrink wrapped roof!


Some places were pretty tricky.


But the results are grand.


Even the scupper looks water tight.


The Hi-Roof does not have parapets,
so edge metal was fit over the
under-layment and around the fly-rafters.


Then the vinyl sheets and pieces were fitted,
and welded,
and resulted in a much welcomed roof.


So this is where we are today...ZEBRA HOUSE...
waiting for windows, ready for more siding.


Thursday, August 20, 2009

CLOUD HOUSE PROGRESSES, EVEN WITHOUT ME!

I should have added photos before I went away in July, but didn't,
so I am playing catch up.
This is what it looked like at the last posting in early June.
Solar rack, with chimneys and skylight is up, and the fly-raftrers are
being laid out on the glue-lam beams.

Framing for the rack, skylight and fly-rafters.
The flys are notched to recess the plywood sheathing.


A case of insulating from above: in the fly-rafter cavity, first the insulation,
then pink foam inserts to assure air flow, then the roof plywood.

With the plywood in place, it can be notched
to take the metal sleeves (part of the weatherproofing scheme).

Meanwhile, out on the ends, where the fly-rafters will sit on them,
the beams have had a water-proofing regimen:
felt paper, shims for air flow, siding, metal cap flashing.
On the far beam, brackets which will hold the fly-rafters have been installed.

Under the fly-rafters, a vent has been built for the insulation below the lo-roof.

And a larger cricket is being built to enhance water flow towards the ends of the lo-roof.

Down on the lower level, Charlie is contemplating siding samples,
as well as the effect of sun beams through holes in the fins.

SO, this is where it was at when I took off for China in mid-July.

While gone, the crew got started on preparing for siding.
Peel&Stick is wrapped at openings and corners.
Felt paper is applied, and white drainage battens are affixed.

Horizontal battens for vertical siding, vertical battens for horizontal.
Makes sense, no?

The first wall to get sided, the west, with 1x4 horizontal red cedar, with small
"V" grooves to suggest water falling from the low roof.

Back to those pesky fly-rafters coming out of the house.
Felt, drainage battens (quick quiz: which way will the siding run here?),
Peel&Stick (never can have too much of that), and finally
those stainless steel sleeves can come to rest.


This has to be vented, so siding goes on, with blocking above...

...to carry the facia, which is blocked out to create the vent openings between the fly-rafters.

The interior has not been totally abandoned.
The header for the sliding doors is in, going the full length of the interior,
and some of the exterior as well!

And of course the engineers were not happy with everything we did.
Here they have asked for the top hold-down be relocated to a higher spot.
Ian has removed it from the beam top and holds in in the new location.
A coupling will hold the additional length of threaded rod required.

And that is what it looked like upon return from China in mid-August.
For the nonce, instead of calling it "Cloud House",
it is is known as "Zebra House".

I finally tried the route between Otis and I-5 which requires a
short ferry ride, but has no traffic signals, nor much traffic.
She holds 9 cars max., and takes about 3 minutes max
to cross the Willamette River at Wheatland.

And out front of the trailer, in the cul-de-sac, grows this!
Anyone know its gastronomic qualities??

Thursday, June 4, 2009

CLOUD HOUSE GETS TOPPED OUT


With low-roof beams in place....
...the low roof rafters could be framed in between...


...and topped with plywood sheathing.


Meanwhile, on the outside, the extensions of the core walls (on left) and the channels for the downspouts (on right) were added.


Back on top, Wayne and Abe set up the posts and brackets for the hi-roof beams.


Once ready, Joey came with his marvelous crane again, and handily completed the last of the four "beam-lifts".


Brian hand signals down to Joey, as Abe and Wayne guide the glu-lam beam into the brackets.

Beams in place, parapet sheathing was placed, carefully notched for the brackets.
Then the solar rack/skylight framing commenced. 


The interior space begins to take shape, and light, with the Big Window on the right, and the skylight above.


Now there are lots of tasks to do. Abe installs the ceiling joists in the kitchen. 
Being 6'-8" tall, he does not have to use his step ladder very much.



And on occasion the architect comes to review progress.
 Here Charlie stands on a scaffold plank to consider the addition of a "diving board"
 off the second level's entry deck.


And, with Bob, contemplates how to waterproof the fly-rafters...


Stepping back, looking up, to see the whole from the driveway...


...and, looking down, to see the tadpoles growing in a rainwater puddle on one of the protection tarps.