Wednesday, August 3, 2011

WELL, AS I ALWAYS SAID...
...we would be finished in July, I just don't known which year.
Now in our fourth July, Cloud House is not finished but getting closer.


Finish site work took place in February.


A gravel driveway installed, and grass seed scattered and covered.


The first thing I did was drive off the gravel into the mud.
AAA came and struggled but got me out, and then
our ace site man Aaron came and cleaned up the mess.


We left off the previous post with the stairs installed.
Next step was getting glass "balusters" put in.


I wasn't there to take picutres of it, but Clayton and the team did a great job.


The grating casts interesting shadows.


Meanwhile, inside, the cedar siding has been laid up. Looking thru a door,
the alignment of the outside siding and inside siding is apparent.

Looking east in the Engawa at the inside/outside alignment.
Finish electrical is in; the white switch is temporary, final will
be black similar to the plug mold receptacle inserted in the siding.
(See it half-way down the wall?)


On the first level, with clearstory window above.
Be hard to stain this grey like the outside, no?


The insulating pocket doors are in as well.
Here they are open on the 2nd Level.
(Note the floor protection is coming off,
revealing the black concrete topping slab;
and art work is going on the walls..)


Now they are closed.
(Note the arrival of a mobile below the skylight.)

Same closed doors, from the SE hall.


Now open, looking west across the living/dining space.


Another view of the mobile.


All this carpentry requires clean up. Thank you Joey!


As well as removal of debris and left-overs.


The fireplace was installed.
Here David is placing the top sections of the flue.


The mechanical chase is getting crowded.


Out the chimney box comes the flue.


FIRE 'er up and see if she smokes.
(Didn't!)


2nd Level bath got fixtures and temporary lighting on this side....


...and shower tile and cove light on the other.


A temporary kitchen, with a sink and cook-top went in, but
we flunked the final inspection because the counter top was not
a water-proof surface. Instead of doing that, the permanent
cabinets and counter top are being made.


However, cooking can occur on the B_B_Q!!!


The entry to the 2nd Level north side.


Looking back, thru an entry on the 1st Level, one can see how
the glass door, glass "balustrade" and open risers, allow as clear a view
as possible.


Going further in, the two windows on the west wall are visible.
The left one is in the NW hall and the right one in the kitchen.
(Note the refrigerator is in on the left.)


However, moving in closer, one can that the" window" in the hall has a door in it!


It's actually a mirror wall, reflecting a
window on the north side of the hall. Getting all three
pieces of mirror in exact alignment is not easy.
So the other three mirror walls are on hold.


In the Engawa, on the south side, there is a window in the west wall,
similar to the one in the kitchen on the north side. They open, allowing
cross breezes thru the doors on the east wall.
The concrete slab is soaking up the btu's on a day like this!

The house gets visitors on occasion. Most recently
David and Bonkana and their children, in Oregon from
Bamako, Mali visiting David's parents in Eugene.


The old mailbox, three years older in the rain and sun of the coast,
still marks the spot for inspectors, tradesmen, and visitors alike.
When will it greet you???



Monday, March 1, 2010

CLOUD HOUSE SOLDERS ON THRU THE RAIN


Return after New Year was just in time to see the
Groth-Gates crew install the last screw of the metal roof.


Nice Job!
Ryan, from Western States Electrical, reviews
how to attach the future PV panels to it.

Meanwhile the crew finished up the vertical siding.
With metal roof in place, siding can go on the solar rack,
so a brown tarp is up to protect the work zone.

A view of the top of the vertical siding:
the fins are notched so the metal parapet
cap flashing can slip down behind them.

Under the tarp, Wayne installs the 4" horizontal siding on the solar rack.
The opening awaits a very custom hatch, the only access to the roofs.


Siding is a bit tricky in the close quarters between the fly-rafters
above and the low roof below, with the glu-lam beams
zooming out in between the two.


Abe and Wayne measure the last piece of clearstory siding.
Note the grooves in the siding on top. That is to give a different look
to the siding on the beams from the siding on the clearstory.
And note the cute windows cut into the clearstory.
They will daylight the south hall below.
The wide cap flashing is on top of the vent for the roof they are sitting on.

Out on their ends, the glu-lams, which carry the fly-rafters,
get a careful detail to allow air to vent the "rain-wall" cavity on each side.

Then a finish piece trims it all out so nicely.


Another view of the glu-lam siding continuing over the top of the clearstory siding.
The glu-lam cap flashing ends abrupty at the clearstory. The flashing gets painted,
so continuing the paint on the siding across to the flashing
on the other end may deal with that discontinuance.

AND FINALLY


Three days predicted for sunny weather brought the four BIG WINDOWS out.
The pane is resting on temporary forks on the front of the man-lift, which
Dustin and Dan raise and swing....


into position, while Clinton and Tom wait.


Once close enough, all four attach suction cups and
push/pull it into position in the frame.

A tug here, a tweek there, and she's set.

Dustin rolls the vinyl glazing strip on the outside, and...


the Tom applies backer-rod and caulking on the inside.
That's all there is to it folks!


After the four BIG ones, the skylight was a snap.
First the frame was brought up, and then...


...three glazing panels were installed and capped.

MEANWHILE, MOCK-UPS CONTINUE:

Charlie is mulling over how to get the rain water from the roof
scupper down to the ground. Black paper outlines what
a six-foot wide "waterfall" might look like.

Here Charlie, with a piece of mirrored acrylic,
considers how to do the mirrored wall
planned for the end of the halls.


The crew set a length of "Plug-mold" in a mock-up of the interior siding
to see if that may be a way to install electrical outlets.

A single fluorescent tube , set in a simple cove, suggests
how well it would illuminate the upper floor below the sky-light.


And Steve the Pipe Magician started running plumbing lines.
Things are happening on many fronts!

A walk up the hill gave this prospect down on to the roofs.

And, with much of the work-platform no longer needed,
its removal revealed what the final form of the house will look like.

Tho the clouds and rain have been with us this winter,
it has not meant there have been no sunrises or sunsets to enjoy!